National Drainage Programme III in the Framework of the Joint Integrated Sector Approach (NDP III - JISA)

Development Partner(s)

Germany, European Union

BENEFICIARIES

Ministry of Electricity and Renewable Energy, Ministry of Water Resources and Irrigation, Ministry of Petroleum and Mineral Resources

AMOUNT

86.5

CURRENCY

EUR

SECTOR(S)

Irrigation

TYPE OF FINANCE :

Loan / Grant

SIGNATURE DATE :

2022-02-10

Objective

Replacement and renewal of covered drainage networks with an amount of 500,000 feddans. Providing100,000 feddans with new covered drainage networks. Expansion and deepening of public drains Replacing some industrial works with the capacity of 50 thousand acres to obtain the optimum irrigation advantages. Increasing production by providing adequate infrastructure for drainage. Extension of infrastructure drainage networks. Strengthening capacity building in the Ministry of Water Resources and Irrigation through the technical support component.

Locations

Upper Egypt